Construction backlog is shrinking. Here's where I'd put your hours.

By Antonia Gardeazabal

Sales & Marketing Director at OfficeTwo

· 6 min read

Share this article
Construction crew in hard hats and safety vests talking on a concrete deck above a rebar-covered job site

THE SHORT VERSION

  • Backlog fell to 8.1 months in October, and almost all of the drop came from contractors without data-center work.
  • Planning for new commercial projects fell too, so next year's bid tables will likely be thinner.
  • Bidding everything won't fix it. Bid with a filter, follow up harder, protect cash, and stop being the only person in your company who can make the call.

If your company isn't building a data center, October's backlog report probably looks a lot like your own pipeline.

Associated Builders and Contractors reported that its Construction Backlog Indicator fell to 8.1 months in October, 0.6 months below September and 0.3 months below a year earlier. What caught my attention was the split. The 88% of contractors with no data-center work saw their backlog drop from 8.3 to 7.6 months. The ones with data-center contracts went the other way, from 11.3 to 11.5 months, and ABC notes that most of them bring in over $100 million a year. ABC's chief economist, Anirban Basu, said backlog is back at levels the industry hasn't seen consistently since last winter.

8.1 mo

Average construction backlog in October, down 0.6 months from September

7.6 vs 11.5

Months of backlog without and with data-center work

-9.0%

Drop in the Dodge Momentum Index, which tracks projects entering planning

Sources: ABC, Nov. 10, 2026; Dodge Construction Network, Nov. 6, 2026.

The planning pipeline says the same thing. The Dodge Momentum Index fell 9.0% in October, with commercial planning down 13.4% and institutional planning down 1.5%. Dodge says the index runs about 12 to 18 months ahead of nonresidential building spending, so this is an early look at what reaches bid tables in 2027.

One caveat before the tips. ABC surveys commercial and industrial contractors. If you run a residential or home services company, these numbers describe your GCs and commercial competitors more than they describe you. You'll still feel them, though. A sub with a thin commercial backlog starts chasing the smaller jobs and service work it used to pass on, and those are your bids.

01 Your estimating desk is now the front door

When the book gets shorter, the instinct is to bid everything. I understand why: it feels like doing something. It's also exactly where estimator hours disappear into jobs you were never going to win.

Tighten your go/no-go call

Pull the last 12 months of bids and sort them by customer, job type and size. Look at where you actually won and where you didn't. Then turn that into a short go/no-go checklist that your estimator and your PM both use. It saves estimator time, and it gives you a clean reason to say no to the GC who sends you every job and awards you none of them.

Price with today's numbers

Margin expectations improved in October, but ABC found that roughly 1 in 4 contractors still expect their margins to shrink over the next six months. With less work in the book, one mispriced job hurts more, because there's less other work to absorb it. Three habits I'd make non-negotiable:

  • Fresh supplier quotes on every bid.
  • An expiration date on every proposal.
  • A second person checks the takeoff, someone who didn't build it.

02 More bids, or better follow-up?

A thinner backlog usually means you need more bids out the door. The real question is where those extra hours come from, and in most shops I'd look at follow-up before raw bid count.

  • Keep one log of every open bid, with a follow-up date and a person who owns it.
  • Call back on the bids you lost and ask what the winning number was. One honest answer tells you more about your pricing than another month of guessing.
  • Reach out to past customers who haven't sent you anything this year. A repeat customer is the cheapest bid you'll ever win.
  • If you're in home services, push maintenance agreements and service plans now. They put recurring work on the calendar that doesn't depend on anyone else's project getting funded.

03 Protect cash before the numbers tell you to

Backlog is future revenue. When it shrinks, your cash plan should get more careful, even if this month's numbers look fine.

Bill on time, and bill everything

Send progress billings the day they're due, and chase receivables on a fixed weekly schedule instead of whenever someone remembers. Write up change orders before the work is done and bill them with the next draw. Unbilled change orders are where a lot of margin quietly leaks out, and we wrote a full post on construction change orders if you want to go deeper. And keep a running list of retainage owed by job, so it doesn't sit forgotten after closeout.

Find your gap

Map your booked work month by month and find the point where it drops off. That date tells you two things: the gap your sales and estimating effort has to fill, and the moment your overhead has to be covered without new jobs. If you think you'll need a line of credit, open it now, while your financials still look strong and before the shorter backlog shows up in them.

04 Don't pull every call back onto your desk

Staffing the office is the hardest call in a softer market, and owners tend to miss in one of two directions. Some hired office staff when backlog was long, and now feel stuck between carrying people they don't need and letting go of people they spent a year training. Others cut the estimating desk to save money, then find out a few months later that they can't get enough bids out to refill the book.

Underneath both mistakes there's usually the same problem: too much of how the business works lives in one person's head. When backlog gets tight, a lot of owners pull every bid, every price and every GC conversation back onto their own desk. It feels safer. It's also what keeps the company from moving any faster than the owner can decide.

Your company can only move as fast as the number of people who understand it well enough to make the call.

What helps:

  • Write your process down. Your estimating and project coordination steps should be clear enough that someone new can follow them without you in the room.
  • Split judgment work from packet work. Your lead estimator should be pricing risk and talking to GCs. Takeoffs, bid-form cleanup, submittal logs, RFI tracking and billing support can sit with someone else.
  • Cross-train. Your project coordinator can help with bid packages in a slow month, and your office manager can cover AR follow-up when collections slip.

YOUR MONDAY LIST

Six things you can start this week

  • Sort last year's bids by customer, job type and size
  • Turn what you find into a one-page go/no-go checklist
  • Start a follow-up log with an owner for every open bid
  • Map booked work month by month and mark the gap
  • Bill every open change order with the next draw
  • Write down one process that only lives in your head

Where OfficeTwo fits

This is the part where I tell you what we do, so I'll keep it plain. At OfficeTwo, we know where Latin America's best professionals are, and we build them into your team. They can work remotely from across Latin America, or from our Buenos Aires office if you want a Second Office with people working together in one place. You direct the work. We handle recruiting, payments, HR and onboarding, and your account manager is there for you the whole time.

Most owners start with one hire. For a construction or home services company, that's often an estimator who learns how you price, so bids stop waiting on your desk, or a project coordinator who keeps submittals and RFIs moving. Architecture and engineering firms feel a planning slowdown early, and a BIM coordinator keeps production going while principals work on the next project. Fabricated metal shops sit downstream of the same commercial work, and a steel detailer helps the shop turn quotes around faster when GCs are pricing carefully.

Not sure which role would free you up first?

That's exactly what a Discovery Call is for. We'll look at where your bids and projects are getting stuck and which hire would take the most off your plate.

Book your Discovery Call →

Sources

Associated Builders and Contractors. (2026, November 10). ABC's Construction Backlog Indicator drops in October. abc.org

Dodge Construction Network. (2026, November 6). Dodge Momentum Index falls 9% in October. construction.com

Share this article
More

ANOTHER WAY TO HIRE

Prefer a one-time fee? Hire directly.

We run the Formula's search and tests, and you hire the person yourself. Our one-time fee equals 4 months of their pay, then you pay them directly. A full first year covered.

THE FIRST ELEMENT

Tell us about your team. We'll run the Formula.

It starts with a Discovery Call about your business and the hire that would change it.